 |
Johannes Gassner prepares lower half of CST for insertion |
 |
Stefan Steiner (striped shirt) and Silvan Streuli (ethno T-shirt) insert
the lower half of the CST |
 |
The upper half of the CST is installed |
 |
Thermal insulation installed, optical fibres are taped to the insulation |
 |
Lower half of the adaptor tube is being installed |
 |
Both halves of the adaptor tube installed |
 |
Adaptor tube and CST are being moved in; left side: Stefan Steiner,
Uni Zurich |
 |
Stefan Steiner about to connect the cables. Water hoses (blue) are
already connected. |
 |
Back side of the CJC and the mounting tube |