small |
Part of the team: Benno List (Ieft), Silvan Streuli (right), about
to start |
small |
Back side of the CJC, everything still in place |
small |
Back side of the CJC, shielding of the power regulators on the adaptor
tube removed |
small |
Same picture, with numbers of the visible cables |
small |
Detail of the cabling; water hoses (blue), optical cables with connectors
are visible |
small |
Fuller view of the cabling; on the left side, the water hose connectors
are visible |
small |
The adaptor tube is being pulled out; left to right: Stefan Hurling,
Benno List, Silvan Streuli |
small |
The upgrade coordinator and Mr. CST, Daniel Pitzl: overexposed, but
in a good mood |
small |
The cabling between the adaptor tube and the CST; some of the cables
have already been plugged out on the adaptor tube side. The pillbox in
the center is one of the radiation monitors. |
small |
The optical cables are being rolled up |
small |
The top half of the CST has been removed |