![cst-ins99-pic1](cst-ins99-pic1.gif) |
Johannes Gassner prepares lower half of CST for insertion |
![cst-ins99-pic2](cst-ins99-pic2.gif) |
Stefan Steiner (striped shirt) and Silvan Streuli (ethno T-shirt) insert
the lower half of the CST |
![cst-ins99-pic3](cst-ins99-pic3.gif) |
The upper half of the CST is installed |
![cst-ins99-pic4](cst-ins99-pic4.gif) |
Thermal insulation installed, optical fibres are taped to the insulation |
![cst-ins99-pic5](cst-ins99-pic5.gif) |
Lower half of the adaptor tube is being installed |
![cst-ins99-pic6](cst-ins99-pic6.gif) |
Both halves of the adaptor tube installed |
![cst-ins99-pic7](cst-ins99-pic7.gif) |
Adaptor tube and CST are being moved in; left side: Stefan Steiner,
Uni Zurich |
![cst-ins99-pic8](cst-ins99-pic8.gif) |
Stefan Steiner about to connect the cables. Water hoses (blue) are
already connected. |
![cst-ins99-pic9](cst-ins99-pic9.gif) |
Back side of the CJC and the mounting tube |