![]() |
6.3.2003:
Shielding stones removed |
![]() |
Shielding at +z between tunnel and Forward Muon Detector. |
![]() |
This wall will come down tomorrow! |
![]() |
Space needed for VFPS bypass transfer. |
![]() |
. |
![]() |
. |
![]() |
. |
![]() |
Hadronic Spacal already removed. |
![]() |
Insert of EM Spacal being removed. |
![]() |
It fits tightly around the GG magnet. |
![]() |
Beam pipe flanges at NR 14m
between the GM proton final focus half-quadrupole magnets (yellow). |
![]() |
The Cu beam pipe apparently got hot.
The beam position monitor is OK. |
![]() |
The burned spot is only on the ring inside.
Synchrotron radiation should only be on the ring outside. |
![]() |
. |
![]() |
. |
![]() |
. |
![]() |
. |
![]() |
BPC. |
![]() |
. |
![]() |
GG transition flange and bellow.
This region got warm with e+ beam and will be modified. |
![]() |
. |
![]() |
. |
![]() |
. |