small |
April 2000 at Daresbury New 8-wire planar chamber completed at Daresbury Lab, UK |
small |
End view detail |
small |
Tim Greenshaw (Liverpool U) and Graham Houghton (Daresbury Lab) with new chamber #2 |
small |
October 2000 at DESY Hall 41 3 supermodules separated in clean room |
small |
SM 0 on assembly and survey table |
small |
SM 0 with 2 new and 3 old planars The GO magnet fits in here |
small |
6.12.00
3 Supermodules back together again |
small |
|
small |
a happy crew |
small |
14.12.00
FTD out of clean room in PETRA hall 41 |
small |
|
small |
|
small |
preamps added |
small |
Feb. 2001 Fully cabled |
small |
|
small |
FTi2 scintillators an PM tubes added |
small |
21.2.2001 Loading onto truck for transport from PETRA SE Hall 41 to Hall North |
small |
Don Clarke taking pictures... |
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
21.2.2001 Lifting through Hall North |
small |
Meanwhile, the CTD was parked under the ceiling |
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
26.2.01 Temporarily insert FTD into Cryostat to remove green frame |
small |
|
small |
FIT almost forgotten |
small |
FIT rescue meeting |
small |
Lay FTD cables over CTD |
small |
|
small |
|
small |
|
small |
View from inside cryostat FTD with FTi-2 |
small |
|
small |
|
small |
FTi-2 has 2 overlapping rings, in front and behind CFK support plate |
small |
Sat, 10.3.2001 FiT added in front of FTi-2 |
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
|
small |
Connection of FTD with CTD |
small |
|
small |
GO support sandwiched between FTD and CTD |
small |
|
small |
|
small |
FTD cables neatly placed over CTD |
small |
|
small |
|
small |
|
small |
|
small |
15.3.2001 Trackers inserted into LAr cryostat |
small |
|
small |