half |
Nov 2000 First BPC hybrid completed by DESY FEC Flex foil Ceramic fan-in Hybrid with 2 APCs from PSI for 256 channels Kapton cable for low voltage, clock, and readout |
half |
Al wire bonds from flex foil to ceramic and from ceramic to APC still missing |
half |
With wire bonds |
half |
|
half |
|
half |
Converter card by A.Beglarian Fan-out for power and signal between OnSiRoC and one BPC half |
half |
21.3.2001 BPC arrives from Dubna at DESY hall 41 |
half |
Width is 10 cm |
half |
6 planes, surrounded and separated by honeycomb-CFK-G11 plates |
half |
White micro-coax cables connect wires to preamps |
half |
> |
half |
Readout electronics will be mounted under these water cooled copper bars |
half |
April 2001 BPC upper half in cosmics test stand in hall 41 |
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
30.5.2001 BPC arrives at Hall North |
half |
Gert Falley and Alexander Vishnevsky |
half |
|
half |
Alexander Vishnevsky, Wolfgang Vahl and Gert Falley |
half |
|
half |
The BPC crew: Alexander Vishnevsky,Gert Falley Alexander Makankin, Sergei Vassiliev |
half |
June 2001 Testing in Hall North |
half |
21.6.2001 Crane to installation position |
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |
|
half |