Pictures

PIC-113-04.jpg
original (1280x1024) [136kB]
small (640x512) [64kB]
PIC-113-04.jpg
05.03.2003 11:46
Shielding stones removed
PIC-113-05.jpg
original (1024x1280) [82kB]
small (512x640) [41kB]
PIC-113-05.jpg
05.03.2003 11:46
Shielding at +z between tunnel and Forward Muon Detector.
PIC-113-06.jpg
original (1280x1024) [90kB]
small (640x512) [45kB]
PIC-113-06.jpg
05.03.2003 11:46
This wall will come down tomorrow!
PIC-113-07.jpg
original (1280x1024) [89kB]
small (640x512) [45kB]
PIC-113-07.jpg
05.03.2003 11:46
Space needed for VFPS bypass transfer.
PIC-113-10.jpg
original (1024x1280) [109kB]
small (512x640) [53kB]
PIC-113-10.jpg
05.03.2003 11:46
Beam pipe flanges at NR 14m between the GM proton final focus half-quadrupole magnets (yellow).
PIC-113-11.jpg
original (1280x1024) [107kB]
small (640x512) [50kB]
PIC-113-11.jpg
05.03.2003 11:46
The Cu beam pipe apparently got hot. The beam position monitor is OK.
PIC-113-12.jpg
original (1280x1024) [114kB]
small (640x512) [54kB]
PIC-113-12.jpg
05.03.2003 11:46
The burned spot is only on the ring inside. Synchrotron radiation should only be on the ring outside.
PIC-113-15.jpg
original (1280x1024) [84kB]
small (640x512) [42kB]
PIC-113-15.jpg
05.03.2003 11:46
Hadronic Spacal already removed.
PIC-113-16.jpg
original (1280x1024) [183kB]
small (640x512) [83kB]
PIC-113-16.jpg
05.03.2003 11:46
Insert of EM Spacal being removed.
PIC-113-17.jpg
original (1280x1024) [147kB]
small (640x512) [72kB]
PIC-113-17.jpg
05.03.2003 11:46
It fits tightly around the GG magnet.