(FTST1 and FTST2) 1999 2000 D J F M A M J J A S O N D J F M A Prototype Design ---->(Simulation On-going) & Simulation Prototype Manufacture ---->(Several designs) Testing ---------->(Bench and Beam Tests) Electrical Design* -------------->(the whole chain HPD -> Logic) & Testing Mechanical Design ---------------- Procure Hardware ---------- Assembly -------------- Commissioning** -----------------------> Installation*** --------------> * Including design of cable routing from detector to trailer. ** Including pre-installation commissioning. *** Installation of cables and services to start as early as possible.