Nov 2000 all old magnets up to 64 m removed |
|
![]() |
North Left (+z) | |
![]() |
North Right (-z) also empty up to 64 m | |
![]() |
The HERA tram is used to transfer magnets from halls East and West | |
![]() |
Survey marks for the new magnets | |
![]() |
Work in the Spin Rotator section of the e-ring | |
![]() |
A quadrupole magnet is split to modify the vacuum chamber | |
![]() |
||
![]() |
View NR towards Hall North | |
![]() |
Comment | |
![]() |
Normal conducting upgrade magnets from Efremov Institute,
St. Petersburg Tested in hall 2 and ready for installation |
|
![]() |
First proton focussing half-quad 'GM'. This magnet defines the beam spot size at the IP |
|
![]() |
5.12.2000 first GM magnet installed at NL 17m | |
![]() |
||
![]() |
||
![]() |
5.12.2000 second GM also installed | |
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
e-beam quads for the spin rotator | |
![]() |
Beam pipes for the e-beam quads in the spin rotator section | |
![]() |
Beam pipes installed in e-beam quads in the NR spin rotator section | |
![]() |
||
![]() |
||
![]() |
20.12.2000 Install GM 13 and 17 m proton magnets NR |
|
![]() |
Beam pipes are still missing - to be installed later... | |
![]() |
||
![]() |
||
![]() |
||
![]() |
The mirror plate of the half-quads can be moved | |
![]() |
4.1.2001 Installation of a GN magnet with the HERA tram |
|
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
Vertical dipole for Spin Rotator | |
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
||
![]() |
Proton magnet dump switches had to be moved for FPS 60m station | |
![]() |
Space for a PRT station | |
![]() |
Helium valves for the NR octant | |
![]() |
April 2001 NL all magnets installed |
|
![]() |
||
![]() |
Last beam pipe sections are installed | |
![]() |
||
![]() |
||
![]() |
||
![]() |
NR all magnets installed | |
![]() |
Synchrotron radiation absorber NR 10m | |
![]() |
||
![]() |
E-tag 40m | |
![]() |
Skew quadrupoles | |
![]() |
Beam pick up monitor NR | |
![]() |
||
![]() |
Lead shielding against electrons North Left | |
![]() |
e beam pipe at GB magnet has NEG pump | |
![]() |
e beam pipe in GN magnet | |
![]() |
SynRad absorber at NR 19m | |
![]() |
||
![]() |