22.9.2000
Central tracker out of cryostat in Hall North |
![]() |
Central tracker end face, still fully cabled |
![]() |
Cabling detail: CJC1, COZ, COP |
![]() |
CJC preamp cards |
![]() |
A sensor used to measure the beam pipe position for CST installation.
By P. Robmann, U Zürich, 1995 |
![]() |
16.10.2000 Central tracker in Hall 5 clean room with disassembly tools. K. Finke checks. |
![]() |
Beam aligned through Central Tracker |
![]() |
25.10.2000 CIP, CIZ, CJC 1, COZ, COP removed |
![]() |
CJC 1 open in front of filter wall in hall 5 clean room |
![]() |
One cell of CJC 1. Rods hold the end plats during repair work |
![]() |
Can you see the 25 micron sense wires? |
![]() |
A. Schleiermacher prepares for CJC 2 removal |
![]() |
15.11.2000 and A. Guddat rewiring 20 sectors in the lower part of CJC 2 |
![]() |
Inserting a wire |
![]() |
A. Guddat prepares the next wire |
![]() |
Dec 2000: HV test |
![]() |
19.12.00 CTD out of clean room in hall 5 |
![]() |
|
![]() |
Ready for survey 2.-3.1.2001 |
![]() |
4.1.2001 Truck transport to Hall North |
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
end Jan 2001 Waiting for the CIP |
![]() |
|
![]() |
22.2.2001 CTD parked under the ceiling during FTD transport |
![]() |
|
![]() |
|
![]() |
|
![]() |