![]() |
Nov 2000 First BPC hybrid completed by DESY FEC Flex foil Ceramic fan-in Hybrid with 2 APCs from PSI for 256 channels Kapton cable for low voltage, clock, and readout |
![]() |
Al wire bonds from flex foil to ceramic and from ceramic to APC still missing |
![]() |
With wire bonds |
![]() |
|
![]() |
|
![]() |
Converter card by A.Beglarian Fan-out for power and signal between OnSiRoC and one BPC half |
![]() |
21.3.2001 BPC arrives from Dubna at DESY hall 41 |
![]() |
Width is 10 cm |
![]() |
6 planes, surrounded and separated by honeycomb-CFK-G11 plates |
![]() |
White micro-coax cables connect wires to preamps |
![]() |
> |
![]() |
Readout electronics will be mounted under these water cooled copper bars |
![]() |
April 2001 BPC upper half in cosmics test stand in hall 41 |
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
30.5.2001 BPC arrives at Hall North |
![]() |
Gert Falley and Alexander Vishnevsky |
![]() |
|
![]() |
Alexander Vishnevsky, Wolfgang Vahl and Gert Falley |
![]() |
|
![]() |
The BPC crew: Alexander Vishnevsky,Gert Falley Alexander Makankin, Sergei Vassiliev |
![]() |
June 2001 Testing in Hall North |
![]() |
21.6.2001 Crane to installation position |
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |
|
![]() |