The H1 ToF and VETO System beyond 2000:

Page is under construction. Things may change quickly!

Sketch of H1 ToF 2000:

Image of H1 with ToF devices
Get this figure in EPS format (useful for including to documents)
Get this picture in PS format (useful for direct printing)


The ToF group is going to submit an Intas proposal

Final version of our proposal(gzipped ps-file)
The submitted Word document
Unfortunately the proposal was not successful
Read the answer text from INTAS.


Note about the upgrade of the ToF and VETO System (Jan 99):

Short description of the modifications
of the H1 Time-of-Flight System
in the framework of the H1/HERA upgrade (ps-file 1.4 MB)

Figures of the Note (EPS files)

Fig-1: Sketch of ToF system after the year 2000.
Fig-2: Sketch of the upgraded H1 Detector.
Fig-3: Sketch of the ToF electronics setup.
Fig-4: Sketch of the VETO electronics setup.


References:
List of H1-notes, Diploma theses and others:
text file
html file


First brainstorming:


Large Vetowall
Small Vetowall
Forward Timing System
Spacal ToF
The FiT (stays untouched)


Last update: January 11th,2000, Ch. Wissing