Figure 6 (part1)


Figure 2.5 of DESY Report H1-96-01
Figure 6
Performance of the HERA storage ring in the first three years of operation. Left: beam currents (top) and luminosity (bottom) measured during a typical run. Right: integrated luminosity accumulated by H1 over the runing periods 1992-1994.
ps file [859 k] of this figure
last figure next figure