Short FNC Shift Instructions


HV problems


If target HV status is not set whithin 5 minutes then just repeat action using individual detector HV control - see instructions attached to A4-A5 top FPS control PC. As a backup solution you can use old FNC HV control on B5R: Locate "Session Manager" small window, then click on "SC_Expert" item in "Applications" menu. When panel starts click on "HV controll" button in top-middle part of the panel. After "Simple FNC HV Control" panel start you can use it to switch HV to ON or to REDUCED 40%. To query HV status use "READ HV Ch.1".


DAQ problems


SSP message "subsystem 101 timeout" or CTrig message "ETAG/FNC - Timeout" indicates problems in the subsytem 101 (ETAG/FNC). In principle ETAG/FNC reboots automatically after some timeout (watchdog).

But faster to reboot the processors manually:

If in doubt call FNC experts: tel. 4169, 94169.


Last modified: 07.12.2006 by Vitaliy Dodonov