New Magnet Bridge


Click on the picture for the full size (1280x1024 pixel) JPEG file,
click on "small" for a reduced size (384x307 pixel) JPEG file.

PIC-31-58small Nov 2000
Magnet bridges assembled and tested in DESY hall 2
PIC-31-59small  
PIC-31-60small  
PIC-35-15small 28.11.2000
New magnet bridges with normal conducting quadrupole magnets GI, GJ
delivered to hall north
PIC-35-12small Completed with vacuum pumps, water cooling tubes and survey points
PIC-35-13small  
PIC-35-16small Bridge for North Right (-z) parked in the hall for one night
PIC-35-26small Magnet support in front of Forward Muon Toroid
PIC-35-27small  
PIC-35-34small  
PIC-35-36small Support for NR bridge
PIC-36-04small 29.11.2000
Insertion of the NR bridge by crane
PIC-36-01small Fine adjustments
PIC-36-05small  
PIC-36-02small  
PIC-36-03small  
PIC-36-09small Pushing and pulling from both ends
PIC-36-08small  
PIC-36-07small It's done!
PIC-38-31small  
PIC-38-32small  
PIC-38-33small  
PIC-39-37small  
PIC-39-38small  
PIC-39-07small  
PIC-39-06small  
PIC-39-29small  
PIC-39-30small  
PIC-37-01small Moving support for NL magnet bridge
PIC-37-02small  
PIC-37-03small  
PIC-38-20small Thu 30.11.2000
Magnet bridge NL is installed
PIC-38-21small  
PIC-38-23small  
PIC-39-05small  
PIC-39-04small  
PIC-39-41small  
PIC-39-39small  
PIC-39-08small  
PIC-39-10small  
PIC-39-22small  
PIC-39-27small  
PIC-39-28small  
PIC-39-31small  
PIC-39-33small  
PIC-39-34small  
PIC-39-35small  
PIC-39-36small  
PIC-39-40small  
PIC-38-30small Tue 6.12.00
Ortstermin machine and survey group
PIC-38-29small  
PIC-39-23small Both bridges installed
PIC-39-24small  
PIC-39-25small  
PIC-52-18half  
PIC-52-20half  
PIC-89-13half  
PIC-87-13half ABS2 with ion getter pump NR6.0 between GI1 and GI2
PIC-87-14half ABS2
PIC-87-01half Bellow between GI1 and ABS2
PIC-87-02half GI1 and ABS2
Black light guides and PM box for ETAG-6
PIC-87-03half  
PIC-87-17half ETAG-6 fibers connected to PM box
PIC-87-16half Veto Wall
PIC-87-15half  
PIC-87-18half Veto wall at -6m
Counter raised for access
PIC-87-19half  
PIC-104-01half ABS3 between GI2 and GJ and IGP NR8.3
March 2002
PIC-104-02half ABS3
PIC-104-03half ABS3
PIC-104-04half ABS3
PIC-104-12half View towards IP:
GJ, IGP NR8.3, GI2, Veto wall (lowered)
PIC-104-08half View from tunnel NR towards IP:
GM, ABS4, GJ, Veto wall
PIC-104-09half  
PIC-104-10half  
PIC-104-11half ABS4
PIC-104-13half  
PIC-104-14half  
PIC-110-22half Oct 2002
ABS3
PIC-110-23half IGP NR8.3 wraped in Alu foil for heating
PIC-110-24half  
PIC-110-25half  
PIC-110-26half ABS3 and IGP NR8.3
PIC-110-27half ABS2 between GI1 and GI2.
IGP NR6.0 wrapped in Alu foil for heating.
PIC-110-28half  
PIC-110-29half  
PIC-110-35half  
PIC-110-36half  
PIC-110-37half  
PIC-110-38half  
PIC-110-39half  
PIC-111-02half Nov 2002.
GI1 on right side with North shell closed.
PIC-111-03half  
PIC-111-05half  
PIC-111-01half 6.11.2002
BTS scintillator at -6 m installed.
PIC-111-04half 2 scintillators from old small veto, 1 mm lead.
Mounted ring inward from above.
IP is towards right.
PIC-111-06half PMTs
PIC-111-07half BTS next to ABS2.
PIC-111-08half  
PIC-111-09half GI1 magnet and 6m BTS.
IP is towards left.
PIC-111-10half BTS at -8.3m.
PIC-111-11half 2 scintillators, separated by 2x1 mm lead.
PIC-111-12half Mounted ring inwards at ABS3.


Last modified: Sun Nov 10 12:44:26 MET 2002
A. Cyz, D. Pitzl