Shift Instructions
Central Muons: Slow Control (Room 307/Rack B16)
EXPERTS: Person Telephone HomePhone CityPhone
General Vladimir Jemanov 2278 83 25 650  
HV/LV Jürgen Schütt 2174/2195 899 77 48  
DAQ/Trigger Jürgen Scheins 3749 490 86 23 4681865
Technicien Dirk Kisch 2237 04121 423 812 0170 40 22 470
Coordination Frieder Niebergall 2146 881 11 77 4681862
Central Muon HV Setting:
Stable conditions / Lumi: ===> Normal Operation
Data taking with bad beam
or during p-injection:
===> Reduced Operation
No data taking
or during e-injection:
===> Standby
Special Problems:
Single tripping HV channels: Don't worry!
They are switched on again automatically.
CAEN Readout Errors:
(This error is indicated on the page for the individual HV crates which you can reach by clicking on the crate symbol.)
Click on: Check CAEN Crate
If this does not help after several trials:
Go to the CAEN crate, use the key switch on the left side and switch HV off. Wait one minute and switch on again. If also this does not help: ===> call an expert.
After power cut or HV OFF: Select the page for the crate in question and click on On...
Temperature warning: This message can be ignored by the shift crew. Increased teperature does not affect the performance in a serious way.
General Remarks:
Usually the Muon Slow Control Main Window , showing the general layout, should
be displayed. The colour code for items is: green for OK, yellow for WARNING and red for ERROR. Click on individual items to get details. Close all windows (apart from the main window) after use since too many open windows
may bring the program to a halt.
Reboot Mac:   e.g. in case of message:   Not enough memory ...
The program with the alias name MuonSC should start automatically.
---> Start it if it is not active. You find it on the Mac desktop. A click on the "Finder" box on the top right of the Mac should show the active programs:
Finder , and MuonSC_csctest2 if everything is ok.
Friedrich Niebergall Last modified: Sat Jul 8 12:20