Forward Silicon Tracker FST


Click on the picture for the full size (1280x1024 pixel) JPEG file,
click on "small" for a reduced size (384x307 pixel) JPEG file.

Pic-29-08small 25.8.2000 at Zeuthen
CFK frame for one wheel on a mounting fixture.
With water cooling pipes
Pic-29-09small  
Pic-29-10small Edge on
Pic-29-14small FST contact ring for power, signal and water cooling
Pic-29-12small A water pipe and part of the closing mechanism
Pic-29-13small Water in and out for wheels and repeater
Pic-29-15small A PCB on the outside
Pic-29-16small Close-up from the outside (+z)
Pic-29-17small  
Pic-31-42small 5.10.2000
Test FST mechanics insertion in Hall North
Pic-31-37small Central tracker +z end
Pic-31-36small  
Pic-31-34small  
Pic-31-33small  
Pic-31-35small  
Pic-31-43small  
Pic-31-44small  
Pic-31-45small  
Pic-31-46small  
Pic-31-38small The contact ring is closed with a long tool from the -z end
Pic-31-39small The tool is supported inside the CFK Mounting tube
Pic-31-40small The CST and BST will be inserted here
Pic-31-41small  
PIC-66-01half 2.4.2001
FST phi-strip wheel assembled in Zeuthen
PIC-66-02half  
PIC-66-03half Two layers are mounted back-to-back
PIC-66-04half  
PIC-66-05half High-precision survey of sensor positions under measuring microscope
PIC-66-10half FST strip repeater boards, from Prague
PIC-66-11half  
PIC-66-12half  
PIC-66-15half FST repeater mechanics with water cooling plates
PIC-66-16half  
PIC-66-20half FST R-strip wheel
PIC-66-18half  
PIC-66-19half  
PIC-pk-01half Assembly in Zeuthen
PIC-pk-02half Hans Henschel
PIC-pk-03half Joachim Meissner
PIC-pk-04half  
PIC-pk-05half  
PIC-pk-06half  
PIC-pk-07half  
PIC-pk-08half Joachim Meissner
PIC-pk-09half  
PIC-pk-10half Wolfgang Lange and Joachim Meissner
PIC-pk-11half  
PIC-pk-15half  
PIC-pk-16half  
PIC-pk-17half  
PIC-pk-19half  
PIC-pk-21half Miroslav Nozicka and Joachim Meissner
PIC-pk-22half  
PIC-pk-13half Outer shield
PIC-pk-20half  
PIC-pk-26half Ready for transport
PIC-pk-23half Wolfgang Lange
PIC-pk-24half Miroslav Nozicka
PIC-pk-25half Joachim Meissner
PIC-70-02half 23.4.2001
FST arrives at Hall North
PIC-70-07half IP end. Silicon behind thin shielding. Dosimeters added.
PIC-70-09half Repeater end. Test for transport damage: OK
PIC-70-10half  
PIC-70-11half  
PIC-69-21half Insert here!
PIC-69-22half  
PIC-69-23half Contact ring is waiting 2.4 m away...
PIC-70-12half Installation starts
PIC-70-13half Hans Henschel and Joachim Meissner
PIC-70-14half  
PIC-70-15half  
PIC-70-16half  
PIC-70-17half It's in!
PIC-70-19half  
PIC-70-20half  
PIC-70-18half Long rod operates the connector bejonett mechanism
PIC-70-26half Final position. Everything fits!


Last modified: Wed Sep 5 12:31:12 MEST 2001
A. Cyz, D. Pitzl